Kuwait-Babyan Island Development Project-Multi-station Formwork System
Release time:
2023-11-03
Kuwait-Babyan Island Development Project-Multi-station Formwork System
Kuwait Bridge Project: The superstructure of highway bridge and railway bridge is composed of 40M 50M 40M navigable hole in the middle and 30 m simply supported T-beam approach bridge on both sides. Among them, the T-beam of the highway bridge has 46 holes, with 14 T-beams per hole, totaling 644. Railway beam 140 holes, each hole 8 pieces, a total of 1120 pieces. A total of 14 sets of steel formwork and 56 bottom formwork were put into the project. Among them, there are 6 sets of formwork for highway beams and 24 bottom formwork: 8 sets of railway beams and 32 bottom formwork. Daily production of 7 pieces.


Sanbo specializes in producing high-speed railway, highway bridge formwork, hanging basket formwork, tunnel lining trolley, integral prefabricated formwork, prefabricated segmental assembly formwork system, mobile formwork bridge building machine and water conservancy engineering machinery.
- All
- Product Management
- News
- Introduction
- Enterprise outlets
- FAQ
- Enterprise Video
- Enterprise Atlas