2023/11/03

Design and Construction of Segmental Bridges

With the continuous development of economy, the construction of urban viaduct, light rail and other bridges has gradually become the primary content of infrastructure construction in China. Under this premise, the introduction of foreign advanced construction skills, speed up the construction speed, reduce the impact on the environment and traffic, and improve the level of civilized construction has become a primary issue in bridge construction. Segmental bridges have been widely used in the construction of PC-connected beams, rigid frames, cable-stayed bridges and arch bridges. China has also made a lot of experience in planning and construction, and has also made considerable progress.


2023/11/03

Short-term Matching Method of Segmental Assembling Technology Passing the Evaluation of Scientific and Technological Achievements

In the first half of last year, a third-party professional scientific and technological achievement evaluation agency organized experts in Beijing in accordance with the relevant provisions of the "Science and Technology Evaluation Measures" of the Ministry of Science and Technology, in accordance with the standards and procedures for the evaluation of scientific and technological achievements, and in line with the principles of science, independence, objectivity, and impartiality. The "Short-term Matching of Segmental Assembled Technology" project conducted a scientific and technological achievement evaluation.


2023/11/03

How to improve the precast process quality of segmental beam?

Segmental beam construction technology is gradually emerging in China. Zhuozhou Sanbo Bridge Company has applied segment beam construction technology to urban rail transit section viaducts on a large scale, and has achieved preliminary results. At the same time, the PG-Y prefabricated segmental beam patchwork epoxy structural adhesive is a two-component modified epoxy adhesive, which is suitable for the joint bonding material for the assembly construction of bridge prefabricated segments by the bridge erecting machine.


2023/11/03

Installation of segmental beam: the construction of Taizhou Bay Sea-Crossing Bridge enters the control node

As one of the control projects of Taizhou coastal expressway, Taizhou Bay Bridge has been paid close attention to since its construction. A few days ago, the construction of the project has entered the control key process of the whole bridge, that is, the installation stage of the segmental beam.


2023/11/03

Hebei Segment Assembled Construction: Construction Procedure of Segment Assembled in West Extension of Huayan Tunnel

The system consists of bottom mold system, side mold system, end mold system, internal mold system and embedded system. Among them, the bottom mold system includes the bottom mold trolley, the bottom mold support, the bottom mold, and the bottom mold hydraulic system; the side mold system includes the side mold, the side mold support, the angle mold, the platform, and the side mold hydraulic system; the end mold system includes the mobile end mold, Fixed end mold; the embedded system includes embedded parts such as sliding track, side mold and end mold.


2023/11/03

Guizhou

The hydraulic stainless steel formwork construction of the first fully enclosed intelligent prefabricated beam yard in Guizhou Province greatly shortens the production cycle of prefabricated beam pieces, and each beam can save 2319 yuan in production cost. A set of templates can be used in different projects, and a set of templates can be used at least 1000 times.


2023/11/03

The company organizes fire drills

In order to enhance the company's employees' awareness of fire safety and their ability to escape and save themselves, on December 12, Sanbo Company organized a fire evacuation and on-site fire fighting drill. More than 100 people participated in the drill.


2023/10/26

Beipanjiang Bridge, which has just been completed and opened to traffic, has won the "Nobel Prize" in the bridge industry"

Segmental beam assembly manufacturers said that the International Bridge Conference is an international bridge academic conference with a high reputation sponsored by the West Pennsylvania Engineers Association of the United States. It has a high influence in the world bridge industry. The International Bridge Conference Award was established in 1988 and is selected once a year. It has been successfully held for 35 sessions so far and is known as the "Nobel Prize" in the bridge industry ".


2023/10/26

Super project hong kong-zhuhai-macao bridge opened to traffic on 24th

After 9 years of construction, the world-renowned "super project" Hong Kong-Zhuhai-Macao Bridge was officially opened to traffic on the 24th. Macau, Hong Kong and Zhuhai are integrated into a "one-hour economic circle". As a cross-sea bridge with long overall span, long steel structure bridge and long submarine immersed tube tunnel in the world, the Hong Kong-Zhuhai-Macao Bridge is also a bridge with complex technology, high construction difficulty and the largest project scale in the history of highway construction. The Hong Kong-Zhuhai-Macao Bridge can be described as a super project. It is proud that in this "high-value" super project, the "Sanbo Template" is proud to participate in it.


2023/10/26

Tusdeer wharf project

The Tusdeer terminal project is located in the middle of the west coast of the Arabian Peninsula. It is an important part of the container port city of Jeddah (Jeddah) in Saudi Arabia. It is close to the Red Sea and faces Sudan across the sea to the west. The geographical location is superior; the land transportation is convenient. It is about 70 kilometers away from the Holy City of Mecca; and there are many international routes to all parts of the world.


< 1...78910 >